Job completed for Vue at Crestwood
Completion date: October 3, 2025
Location: Birmingham, AL
Solutions provided:
A fire originated inside the apartment, causing severe structural and content damage throughout the affected area. Our team responded promptly to remove all compromised material and begin the mitigation process. Using specialized dry-cleaning methods, including HEPA vacuuming and chemical sponges, we carefully removed soot from salvageable surfaces. These efforts ensured the space was properly cleaned, stabilized, and prepared for the rebuilding phase.
Team members on this project:
John Hinchee, Ryan Brazelton, Nathen Brazelton
Photos & Videos:

